{"id":444,"date":"2025-09-24T07:45:11","date_gmt":"2025-09-24T07:45:11","guid":{"rendered":"https:\/\/avik.ghagi.com.au\/code\/asgs\/?post_type=project&#038;p=444"},"modified":"2025-09-24T07:45:11","modified_gmt":"2025-09-24T07:45:11","slug":"london-road-bridge-port-lincoln","status":"publish","type":"project","link":"https:\/\/avik.ghagi.com.au\/code\/asgs\/project\/london-road-bridge-port-lincoln\/","title":{"rendered":"London Road Bridge &#8211; Port Lincoln"},"content":{"rendered":"<p data-start=\"153\" data-end=\"303\"><strong data-start=\"153\" data-end=\"164\">Client:<\/strong> BMD<br data-start=\"198\" data-end=\"201\" \/><strong data-start=\"201\" data-end=\"232\">Demolition Project Manager:<\/strong> Stan Kapoulitsas<br data-start=\"249\" data-end=\"252\" \/><strong data-start=\"252\" data-end=\"286\">Project\/Demolition Supervisor:<\/strong> David Mortimer<\/p>\n<p data-start=\"305\" data-end=\"621\">ASGS successfully delivered the demolition of the London Road Bridge in Port Lincoln after being awarded this highly competitive tender. The project was completed with precision, efficiency, and full compliance with safety and operational requirements, earning commendation from the client for our professionalism.<\/p>\n<p data-start=\"623\" data-end=\"1076\">The scope of works included the <strong data-start=\"655\" data-end=\"692\">complete demolition of the bridge<\/strong>, carried out within the strict constraints of active train operating schedules. Our team managed the <strong data-start=\"794\" data-end=\"860\">removal and off-site disposal of over 2,000 tonnes of concrete<\/strong>, ensuring all materials were handled safely and responsibly. In addition, we completed a thorough <strong data-start=\"959\" data-end=\"977\">site clearance<\/strong>, removing surrounding fences, pits, and stobie poles to prepare the area for future development.<\/p>\n<p data-start=\"1078\" data-end=\"1420\">Despite the complexity of working around live rail operations, ASGS delivered the project on time and to the highest standard, reinforcing our reputation for tackling technically demanding demolition works. This project stands as another example of our ability to complete large-scale infrastructure projects with precision and reliability.<\/p>\n","protected":false},"featured_media":445,"template":"","class_list":["post-444","project","type-project","status-publish","has-post-thumbnail","hentry","entry"],"acf":{"photo_gallery":{"other_images":[[{"id":448,"title":"London Road Bridge 4","caption":"","full_image_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Bridge-4.jpeg","thumbnail_image_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Bridge-4-150x150.jpeg","large_srcset":false,"medium_srcset":false,"media_details":{"width":869,"height":652,"sizes":{"medium":{"file":"London-Road-Bridge-4-300x225.jpeg","width":300,"height":225,"mime-type":"image\/jpeg","filesize":18579,"source_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Bridge-4-300x225.jpeg"},"thumbnail":{"file":"London-Road-Bridge-4-150x150.jpeg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":7395,"source_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Bridge-4-150x150.jpeg"},"medium_large":{"file":"London-Road-Bridge-4-768x576.jpeg","width":768,"height":576,"mime-type":"image\/jpeg","filesize":88675,"source_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Bridge-4-768x576.jpeg"},"sow-carousel-default":{"file":"London-Road-Bridge-4-272x182.jpeg","width":272,"height":182,"mime-type":"image\/jpeg","filesize":14467,"source_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Bridge-4-272x182.jpeg"}}},"alt_text":"","url":"","target":""},{"id":447,"title":"London Road Bridge 2","caption":"","full_image_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Bridge-2.jpeg","thumbnail_image_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Bridge-2-150x150.jpeg","large_srcset":false,"medium_srcset":false,"media_details":{"width":864,"height":648,"sizes":{"medium":{"file":"London-Road-Bridge-2-300x225.jpeg","width":300,"height":225,"mime-type":"image\/jpeg","filesize":12462,"source_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Bridge-2-300x225.jpeg"},"thumbnail":{"file":"London-Road-Bridge-2-150x150.jpeg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":4865,"source_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Bridge-2-150x150.jpeg"},"medium_large":{"file":"London-Road-Bridge-2-768x576.jpeg","width":768,"height":576,"mime-type":"image\/jpeg","filesize":63134,"source_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Bridge-2-768x576.jpeg"},"sow-carousel-default":{"file":"London-Road-Bridge-2-272x182.jpeg","width":272,"height":182,"mime-type":"image\/jpeg","filesize":9678,"source_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Bridge-2-272x182.jpeg"}}},"alt_text":"","url":"","target":""},{"id":446,"title":"London Road Brdge 3","caption":"","full_image_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Brdge-3.jpeg","thumbnail_image_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Brdge-3-150x150.jpeg","large_srcset":false,"medium_srcset":false,"media_details":{"width":878,"height":658,"sizes":{"medium":{"file":"London-Road-Brdge-3-300x225.jpeg","width":300,"height":225,"mime-type":"image\/jpeg","filesize":17719,"source_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Brdge-3-300x225.jpeg"},"thumbnail":{"file":"London-Road-Brdge-3-150x150.jpeg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":7251,"source_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Brdge-3-150x150.jpeg"},"medium_large":{"file":"London-Road-Brdge-3-768x576.jpeg","width":768,"height":576,"mime-type":"image\/jpeg","filesize":83067,"source_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Brdge-3-768x576.jpeg"},"sow-carousel-default":{"file":"London-Road-Brdge-3-272x182.jpeg","width":272,"height":182,"mime-type":"image\/jpeg","filesize":13194,"source_url":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-content\/uploads\/2025\/09\/London-Road-Brdge-3-272x182.jpeg"}}},"alt_text":"","url":"","target":""}]]}},"_links":{"self":[{"href":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-json\/wp\/v2\/project\/444","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":1,"href":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-json\/wp\/v2\/project\/444\/revisions"}],"predecessor-version":[{"id":449,"href":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-json\/wp\/v2\/project\/444\/revisions\/449"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-json\/wp\/v2\/media\/445"}],"wp:attachment":[{"href":"https:\/\/avik.ghagi.com.au\/code\/asgs\/wp-json\/wp\/v2\/media?parent=444"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}